Interview questions on spikes and prototypes. These probe whether you understand the discipline — one question, a time box, throwaway code, a recorded decision — and whether you can keep the spike / prototype / PoC / MVP distinctions straight. Strong answers are concrete and tie exploration to risk. Watch for the trap baked into several questions: the interviewer is checking that you'd never ship the spike.
Q1. What is a spike?¶
A spike (from Extreme Programming) is a small, time-boxed, throwaway piece of code written to answer one specific technical question you can't answer by reading or reasoning. Its deliverable is a decision plus a short writeup, not a feature.
Trap: "It's a quick prototype." Too loose. The defining traits are one question, a time box, and that the code is thrown away. Miss those and it isn't a spike.
Q2. Spike vs prototype vs PoC vs MVP — what's the difference?¶
| Answers | Kept? | Real product? | |
|---|---|---|---|
| Spike | One technical unknown | No | No |
| Prototype | What should it look/work like? | Usually no | No |
| PoC | Is this whole approach viable? | Sometimes | No |
| MVP | Will real users get value? | Yes | Yes |
The fault line: spike/prototype/PoC are exploratory and disposable; the MVP is real, shippable production software. Conflating them is how teams accidentally ship experiments.
Follow-up — "Is an MVP a prototype?" No. An MVP is the smallest production product; a prototype is not production. Different intent, different quality bar.
Q3. What do you do with spike code when you're done?¶
Delete it. You keep the knowledge — the decision and the writeup — and throw away the code, then implement the real thing properly through normal review and testing.
Trap: "If it works, build on it." That's the prototype-to-production trap. Spike code is deliberately low quality — no tests, no error handling, hardcoded shortcuts — so every shortcut you took on purpose becomes permanent debt if you promote it.
Q4. Why is the time box essential, not optional?¶
The time box is the mechanism that makes a spike safe. It encodes the judgment "this uncertainty is worth at most N hours to resolve." Without it, exploration expands to fill all available time and a 2-hour risk-reduction becomes a 2-week rabbit hole.
Follow-up — "What if you hit the box without an answer?" That is a result: the problem is harder than planned. You report that to planning — don't silently keep going.
Q5. When should you NOT spike?¶
When the answer is knowable without running code: it's in the docs, a colleague already knows it, or a back-of-envelope calculation settles it. Also when it's a design preference (resolve by discussion) or a reversible decision (just pick one and move). Spike only when the answer is unknowable without code and the decision is expensive to reverse.
Trap: treating the spike as the default for any uncertainty. Over-spiking is procrastination dressed as diligence.
Q6. What's the difference between throwaway and evolutionary prototyping?¶
Throwaway prototyping builds fast and ugly to learn, then discards the code (a spike is always this kind). Evolutionary prototyping builds to production quality from the start and grows the same code into the product (walking skeletons, tracer bullets).
The danger is ambiguity — code written "to explore" with a quiet hope it survives. Decide which kind you're doing up front; that decision sets the quality bar.
Q7. What are tracer bullets, and how do they differ from a spike?¶
Tracer bullets (Hunt & Thomas, The Pragmatic Programmer) are a thin, real, end-to-end slice through every layer of the system that you build first to "see where your shots land," then thicken. Critically, Hunt & Thomas are explicit that tracer code is kept — unlike a prototype.
So: spike = throwaway code for one question; tracer bullet = kept code proving the layers connect. Confusing them means either over-engineering a spike or under-building a skeleton.
Q8. What is a walking skeleton?¶
A walking skeleton (Alistair Cockburn) is a tiny end-to-end implementation that exercises the whole architecture — every major component wired together, deployed through the real pipeline, each doing almost nothing yet. It "walks" (runs end-to-end) but has no muscle. You build it to de-risk integration before filling in logic, and you keep and grow it — it's evolutionary, not a spike.
Q9. Several unknowns in a project — which do you spike first?¶
The one with the highest impact-if-wrong × uncertainty — the assumption that, if false, kills or reshapes the whole plan. You test that before building anything around it, so that if it fails, the cost of failure is near zero.
Trap: doing the easy/comfortable unknowns first. If the scary unknown turns out impossible, everything built around it is wasted.
Q10. How do you make sure a spike actually answers something?¶
Frame it as an acceptance question with a pass/fail threshold, and design it to fail loudly: use realistic (production-scale, adversarial) inputs, and pre-commit to the decision the result triggers. A spike rigged to succeed on the happy path is a demo, not an experiment — it teaches you nothing because it can't disconfirm your belief.
Q11. How is a spike tracked differently from a feature on the board?¶
A spike is a research task with a time box, not an estimate. "Done" = question answered + writeup/decision, not code shipped. The card should read: "spend ≤ X to answer Q so we can decide D." If you can't fill in Q and D, it isn't ready to be a spike.
Trap: "How long will the spike take?" — you don't estimate uncertainty, you cap it.
Q12. "Plan to throw one away" — is that still good advice?¶
It's from Fred Brooks's The Mythical Man-Month: "plan to throw one away; you will, anyhow." Brooks himself later partially retracted it, favoring incremental/iterative development over building a whole throwaway system.
The defensible modern reading is staged throwaway: discard small, early, cheap experiments (spikes, gate prototypes) — not an entire first product. Citing the retraction signals you understand the principle rather than parroting the slogan.
Q13. A prototype impressed leadership and they want to ship it next week. What do you say?¶
The prototype proved viability, not readiness. It has no tests, no error handling, and shortcuts taken to move fast. Shipping it converts deliberate shortcuts into permanent production debt. The right path: treat the prototype as a successful experiment, then build the real thing as a properly-scoped, quality-gated effort informed by what the prototype taught us — never git merge the prototype into prod.
This is the prototype-to-production trap in its most dangerous form, because the pressure comes from above.
Q14. What's the best possible outcome of a spike?¶
Often, that it kills a direction cheaply — returns "no, this won't work" after a day, saving weeks of doomed work. That's a win, not a failure. To capture it, pre-commit the decision rule before running ("if p95 > 200ms we drop the synchronous design") so the inconvenient result is acted on without a sunk-cost argument, and so nobody is tempted to rig the spike toward "success."
Q15. How does a spike relate to the scientific method?¶
A spike is the scientific method applied to a build risk: a hypothesis ("library X can do Y at acceptable cost"), a falsifiable experiment (the smallest code exercising the risky part), an observation, and a conclusion (a recorded decision). It must be honestly falsifiable — if it can only succeed, it isn't an experiment, it's a demo. See hypothesis & falsifiability and measure before optimize for the adjacent disciplines.