  1. Introduction
  2. Prerequisites
  3. Glossary
  4. Core Concept 1 — can-i-deploy and the deployment matrix
  5. Core Concept 2 — Wiring can-i-deploy into CD
  6. Core Concept 3 — Pact vs schema-based contract testing
  7. Core Concept 4 — Protobuf/gRPC compatibility with buf
  8. Core Concept 5 — Bi-directional contract testing
  9. Core Concept 6 — Async and event-driven message contracts
  10. Core Concept 7 — Spring Cloud Contract and provider-driven flows
  11. Core Concept 8 — Boundaries: what contracts will not catch
  12. Real-World Examples
  13. Mental Models
  14. Common Mistakes
  15. Test Yourself
  16. Cheat Sheet
  17. Summary
  18. Further Reading
  19. Related Topics

Introduction

Focus: turning verified contracts into a deployment gate, and choosing the right contract mechanism per protocol.

By now you know the Pact loop. The senior question is: what do you do with the verification results? The answer — and contract testing's killer feature — is can-i-deploy: before releasing provider vX, ask the broker whether every consumer currently in production is still satisfied. If yes, deploy; if no, block. This converts contract testing from "a nicer integration test" into a release safety mechanism.

This tier also surveys the landscape beyond Pact — schema-based testing (OpenAPI/JSON Schema, Protobuf/gRPC, buf breaking-change detection), bi-directional contracts, and message contracts for async systems — so you can pick the right tool per boundary.


Prerequisites

  • You completed middle.md: the Pact loop, broker, provider states, versioning.
  • You operate a CD pipeline and understand deploy gates.
  • You've worked with at least one of: OpenAPI, JSON Schema, gRPC/Protobuf.
  • Familiar with event-driven systems (queues/streams); see the microservice-communication skill.
  • Familiar with API versioning concepts (the api-versioning skill).

Glossary

Term Meaning
can-i-deploy A broker query: is it safe to deploy pacticipant version X to environment E, given what's already there?
Deployment matrix The cross-product of consumer versions × provider versions × verification results.
Schema-based testing Validating messages against a schema (OpenAPI/JSON Schema/Protobuf) rather than recorded interactions.
Bi-directional contract testing Cross-checking a provider's published schema against each consumer's pact, without running provider verification.
Message pact A contract over an async message (event/command) rather than an HTTP request/response.
buf A Protobuf tooling suite that includes wire/source breaking-change detection.
Provider-driven Contract derived from the provider's own spec/tests (e.g. Spring Cloud Contract).
Wire compatibility Whether a serialized message produced by old code can be read by new code, and vice versa.

Core Concept 1 — can-i-deploy and the deployment matrix

The broker tracks, for every interaction, which provider versions have verified which consumer versions. That table is the deployment matrix:

                 PaymentsService versions
                 v1 (prod)   v2 (staging)   v3 (candidate)
OrdersService
  v7 (prod)         ✅            ✅              ✅
  v8 (staging)      ✅            ✅              ❌   ← v3 drops a field v8 reads
MobileApp
  v3 (prod)         ✅            ✅              ✅

can-i-deploy answers a precise question against this matrix:

"If I deploy PaymentsService v3 to production, is every consumer version currently in production still verified?"

It looks up the consumers in production (OrdersService v7, MobileApp v3), checks the column for v3, and sees both ✅ — so the deploy is safe. OrdersService v8 is ❌ against v3, but v8 isn't in production yet, so it doesn't block this deploy (it does mean v8 can't deploy until v3 ships and v8 adapts — the gate stays consistent).

# Can I deploy PaymentsService at this commit to production?
pact-broker can-i-deploy \
  --pacticipant PaymentsService \
  --version "$GIT_SHA" \
  --to-environment production \
  --broker-base-url "$PACT_BROKER_URL" \
  --broker-token "$PACT_BROKER_TOKEN"

A passing run prints the satisfied matrix and exits 0; a failing run names the unsatisfied consumer and exits non-zero — which is exactly what a pipeline needs.


Core Concept 2 — Wiring can-i-deploy into CD

The gate belongs immediately before deploy, after the artifact is built and (for providers) after verification has run. The sequence:

Provider pipeline (PaymentsService):
  build → unit tests → publish provider version + branch
        → run Pact verification (records results in broker)
        → can-i-deploy --to-environment production   ← GATE
        → deploy
        → record-deployment --environment production

Consumer pipeline (OrdersService):
  build → consumer pact test → publish pact (version + branch)
        → can-i-deploy --to-environment production   ← GATE
        → deploy
        → record-deployment --environment production

Two operational details that separate a working gate from a decorative one:

  • record-deployment after every deploy. The gate is only as accurate as the broker's view of "what's in production." If you forget to record deployments, can-i-deploy reasons about the wrong set of consumer versions.
  • --retry-while-unknown for async pipelines. When a consumer publishes a brand-new contract that the provider hasn't verified yet, can-i-deploy can wait (with a timeout) for verification to land, rather than failing on a transient "unknown" state:
pact-broker can-i-deploy --pacticipant OrdersService --version "$GIT_SHA" \
  --to-environment production \
  --retry-while-unknown 30 --retry-interval 10

This is where contract testing pays back the ceremony: a single broker query, in both pipelines, replaces an entire shared pre-prod environment for catching interface breaks.


Core Concept 3 — Pact vs schema-based contract testing

Pact records concrete interactions. Schema-based testing validates against a declared schema. They make different trade-offs:

Dimension Pact (interaction-based) Schema-based (OpenAPI/JSON Schema)
Source of truth What consumers actually use The provider's declared interface
Catches unused-field removal Yes (if a consumer reads it) No (schema doesn't know who reads what)
Catches over-promising Yes (consumer-scoped) Partially
Requires consumer participation Yes No
Best for Internal services, known consumers Public/partner APIs, many/unknown consumers
Async support Yes (message pacts) Schema only (e.g. AsyncAPI)

The decision hinges on who your consumers are:

  • Known, internal consumers → Pact/CDC. You get the strong "no silent break" guarantee because the broker knows every consumer's exact needs.
  • Unknown/public consumers → schema-based. You can't run consumer-driven verification against consumers you can't enumerate, so you validate against the published schema and apply compatibility rules (additive-only changes, deprecation windows — see the api-versioning skill).

Many orgs run both: schema validation for the public edge, Pact for internal service-to-service.


Core Concept 4 — Protobuf/gRPC compatibility with buf

For gRPC, the contract is the .proto schema, and the relevant property is wire/source compatibility: can new code read messages from old code, and vice versa? buf detects breaking changes mechanically — perfect for a CI gate.

# buf.yaml
version: v2
breaking:
  use:
    - WIRE_JSON   # catches changes that break wire OR JSON compatibility
// payment.proto — original
message Payment {
  int64 id = 1;
  string status = 2;
  int64 amount = 3;
}
// payment.proto — proposed change
message Payment {
  int64 id = 1;
  string status = 2;
  string amount = 3;   // ⚠️ changed type AND reused field number 3
}
# Compare working tree against the version on main:
buf breaking --against '.git#branch=main'
payment.proto:5:3: Field "3" on message "Payment" changed type
  from "int64" to "string". (FIELD_SAME_TYPE)

buf enforces Protobuf's compatibility rules: don't change a field's type, don't reuse field numbers, don't remove fields that may still be on the wire (reserve them instead). This is provider-driven, schema-based contract testing specialized to Protobuf — no consumer pacts required, because Protobuf's field-number discipline makes compatibility a static property of the schema.


Core Concept 5 — Bi-directional contract testing

Pact verification requires running the provider. Sometimes you can't or don't want to — the provider already has a high-quality OpenAPI spec, or it's a third party. Bi-directional contract testing (a PactFlow feature) cross-checks two independently produced artifacts:

Consumer side:   produces a pact (what it needs)            ─┐
                                                             ├─►  PactFlow compares them
Provider side:   produces/uploads an OpenAPI spec +         ─┘     "Is every consumer
                 evidence its API matches the spec                  interaction allowed
                 (its own functional tests)                         by the provider spec?"

The broker statically checks that every interaction in the consumer pact is permitted by the provider's schema. No provider replay needed. The trade-off: it's only as good as the provider's evidence that its real API matches its published spec — so providers must back the spec with their own tests. Use it when running provider verification is impractical but a trustworthy schema exists.


Core Concept 6 — Async and event-driven message contracts

Contract testing isn't only for HTTP. In event-driven systems the "interface" is the message on a queue/topic — and the same consumer-driven logic applies. Pact calls these message pacts: the contract is over the message body and metadata, decoupled from transport.

// consumer: an OrderEvents handler that consumes "payment.settled" messages
const { MessageConsumerPact, MatchersV3 } = require('@pact-foundation/pact');
const { like, integer, string } = MatchersV3;
const { handlePaymentSettled } = require('../src/handlers');

const messagePact = new MessageConsumerPact({
  consumer: 'OrdersService',
  provider: 'PaymentsService',
  dir: './pacts',
});

describe('payment.settled consumer', () => {
  it('handles a settled-payment event', () => {
    return messagePact
      .given('a payment has settled')
      .expectsToReceive('a payment.settled event')
      .withContent(like({
        type: string('payment.settled'),
        paymentId: integer(42),
        amount: integer(1999),
      }))
      .verify(async (message) => {
        // real handler logic runs against the contracted message shape
        await handlePaymentSettled(message.contents);
      });
  });
});

The provider then verifies it produces messages of that shape (a provider-side message verification that invokes the code path which emits the event). The broker, can-i-deploy, and versioning all work identically — the only change is that the unit of contract is a message, not a request/response. For the broader async landscape, see the microservice-communication skill; schema-based async work uses AsyncAPI the way OpenAPI serves sync APIs.


Core Concept 7 — Spring Cloud Contract and provider-driven flows

Pact is consumer-driven by default. Spring Cloud Contract (SCC) inverts it: the provider authors contracts (Groovy/YAML DSL), and the tooling generates (a) provider-side verification tests and (b) consumer-side stubs published to a stub repository.

// provider-authored contract (Spring Cloud Contract DSL)
Contract.make {
  request {
    method 'GET'
    url '/payments/42'
  }
  response {
    status 200
    headers { contentType(applicationJson()) }
    body([ id: 42, status: 'settled', amount: 1999 ])
    bodyMatchers {
      jsonPath('$.id', byType())
      jsonPath('$.status', byRegex('settled|pending|failed'))
    }
  }
}

Trade-off vs Pact/CDC: SCC is convenient when the provider team wants to own the contract and ship stubs for consumers, and it fits Spring shops well. But because it's provider-authored, it gives a weaker "no silent break" guarantee than true consumer-driven Pact — the provider can still drop a field no contract happens to mention. Choose based on who should own the contract (the deep org trade-off is in professional.md).


Core Concept 8 — Boundaries: what contracts will not catch

Senior judgment is knowing the gaps and covering them elsewhere:

  • Business behavior. A contract says /payments/42 returns a status field. It cannot tell you the status is correct. That's the provider's functional/unit tests.
  • Semantic drift within a stable shape. If amount silently switches from cents to dollars while staying an integer, the contract still passes. Encode units in the field name or type, and cover semantics with the provider's own tests.
  • Cross-interaction workflows. "Create payment, then refund it" spans multiple calls and state — that's a job for a thin layer of end-to-end tests.
  • Non-functional concerns. Latency, throughput, auth correctness — out of scope (see performance and load testing).

Contract testing guards the seam's shape. Keep a small, deliberate E2E layer for end-to-end behavior of critical journeys — see the test pyramid.


Real-World Examples

  • Release gate in CD. A payments team runs can-i-deploy --to-environment production before every deploy. A change that drops currency is blocked because OrdersService v7 (in prod) reads it — the deploy never happens, no incident.
  • gRPC monorepo gate. A platform team runs buf breaking --against '.git#branch=main' on every PR touching .proto files. A junior reuses a field number; the gate fails the PR with a precise message before any service rebuilds.
  • Public API + internal services. A company validates its public REST API against an OpenAPI schema (bi-directional, since consumers are external) while using Pact/CDC for the dozen internal services behind it.
  • Event stream. A payment.settled event adds a field — safe. A later change renames paymentIdid; the message pact for OrdersService fails verification, caught before the producer deploys.

Mental Models

  • can-i-deploy is a question to the matrix, not a test run. No code executes; it's a lookup over recorded results. That's why it's instant and reliable.
  • Pact = "what's used"; schema = "what's offered." Pick by whether you can enumerate your consumers.
  • Protobuf makes compatibility static. Field numbers turn wire compatibility into a property a tool (buf) can prove without running anything.
  • Messages are just interactions without a synchronous response. Everything else about contract testing carries over.

Common Mistakes

  • Running can-i-deploy without recording deployments. The gate reasons about the wrong production set and silently gives wrong answers.
  • Putting the gate after deploy. It must block before the artifact reaches the environment.
  • Using Pact for unknown public consumers. You can't verify consumers you can't list; use schema-based testing there.
  • Reusing Protobuf field numbers / changing types. The classic gRPC break; reserve removed numbers instead.
  • Trusting bi-directional results without provider evidence. If the provider's OpenAPI spec lies, the static check passes while production breaks.
  • Expecting contracts to catch unit/cents semantic bugs. Same shape, wrong meaning — out of scope.

Test Yourself

  1. Explain can-i-deploy in terms of the deployment matrix. What exactly does it look up?
  2. Why must record-deployment run after every deploy for the gate to be correct?
  3. Give one boundary where Pact/CDC fits and one where schema-based testing fits, and justify each.
  4. What property does buf breaking enforce that makes consumer pacts unnecessary for gRPC?
  5. How does bi-directional contract testing avoid running provider verification, and what's the catch?
  6. A message pact passes but the producer emits amount in dollars instead of cents. Why doesn't the contract catch it, and where should it be caught?

Cheat Sheet

can-i-deploy (the killer feature):
  pact-broker can-i-deploy --pacticipant P --version $SHA --to-environment production
  → checks: is every consumer CURRENTLY IN prod still verified against this version?
  Place BEFORE deploy. Always record-deployment AFTER deploy.
  --retry-while-unknown for async pipelines awaiting verification.

Choosing a mechanism:
  Known internal consumers  → Pact / CDC (strong no-silent-break)
  Unknown/public consumers  → schema-based (OpenAPI/JSON Schema)
  gRPC/Protobuf             → buf breaking --against '.git#branch=main'
  Provider owns contract    → Spring Cloud Contract (provider-driven)
  Can't run provider verify → bi-directional (needs provider spec + evidence)
  Async events              → message pacts (or AsyncAPI schemas)

Protobuf rules buf enforces:
  don't change field type · don't reuse field numbers · reserve removed fields

NOT covered by contracts: business behavior, units/semantics, multi-step
workflows, latency/auth → cover with unit + thin E2E + perf tests.

Summary

can-i-deploy is contract testing's payoff: a broker lookup over the deployment matrix that blocks a release if any consumer currently in production would break — replacing a shared pre-prod environment for interface safety. Place it before deploy and keep the broker's deployment records accurate. Beyond Pact, choose per boundary: Pact/CDC for known internal consumers, schema-based (OpenAPI/JSON Schema) for public/unknown ones, buf breaking-change detection for gRPC, message pacts (or AsyncAPI) for events, and bi-directional checks when you can't run provider verification. Contracts guard the shape of the seam — not business behavior — so keep a thin E2E layer for journeys. professional.md covers adopting all this across an org.


Further Reading

  • Pact docs — can-i-deploy, Message pacts, Deployments and environments.
  • PactFlow — Bi-directional contract testing guide.
  • buf docs — Breaking change detection, Protobuf compatibility rules.
  • Spring Cloud Contract reference; AsyncAPI specification.
  • The api-versioning, api-testing, and microservice-communication skills.